Case Study: Fluoride Removal Wastewater Treatment Project for an Automobile Manufacturing Plant
August 6, 2026
Project Background
Project Overview
At a large-scale automobile manufacturer, the fluoride concentration in the effluent from the existing wastewater treatment system remained stable at approximately 15 ppm exceeding the latest local discharge limit of ≤1 ppm.Consequently, the enterprise initiated a dedicated upgrade and retrofit project, requiring the design of a high-efficiency fluoride removal system with a treatment capacity of 20 m³/h to ensure long-term compliance with discharge standards.